The SPITZKE Group

References

References selected by:

<previous 10  |  next 10>
Reference 1 – 10 of altogether 326

GE Langschede — Schwerte (east)

Approx. 4 km mechanical track renewal of line 2550 more...

PDF-download

IKI Meppen - Leer

Integrated Communication Infrastructure (IKI)
Meppen station – Leer station section
  more...

PDF-download

Hammerbrook package – Wilhelmsburg (S-Bahn in Hamburg)

 Track renewal for Hamburg’s urban railway more...

PDF-download

Electrotechnical line equipment in Rangsdorf

Construction of new overhead contact line systems, adjustment of the control and safety engineering, telecommunications infrastructure and the 50Hz supply associated with the removal of a level crossing and construction of a new railway bridge crossing by the Equipment/Electrical Engineering Division more...

PDF-download

Westend-Halensee Track Renewal

Renewal of the track and conductor rail system of the Berlin urban rail line from Westend – Halensee and return direction  more...

PDF-download

Three Lakes Railway

Implementation of 280 special deep foundations   more...

PDF-download

R-GE Neufahrn-Regensburg

Around the clock rail replacement and bed cleaning  more...

PDF-download

Pilot project in Switzerland

Track renewal between Rekingen and Zweidlen   more...

PDF-download

Wehrhahn Line Düsseldorf

Construction of a new underground railway line   more...

PDF-download

Schönfließ and Arkenberge DC substations on the S8

Schönfließ and Arkenberge DC substations on the S8  more...

PDF-download
<previous 10  |  next 10>
Reference 1 – 10 of altogether 326
Follow us
Facebook Xing LinkedIn Instagram
Google+